Log In

Reset Password
BERMUDA | RSS PODCAST

RBYC plan for floating dock for sailboats approved

Development Applications Committee Minutes. July 12.PagetP0117/13 JEFFREY, Mr. Michael (Received: 18 Apr, 2013)13 Trimingham Hill, PagetProposed Internal Conversion of Guest Unit into 3rd Dwelling Unit.ApprovedPlanner: Cory BrownConditions:- Planning Permission - Building Permit - General - Garbage storage Outdoor Space - Private Amenity -2008 Plan - ParkingPembroke(Revised: 13 June 2013, 27 June 2013)P0063/13 BINETTI, Mr./Mrs. Mario (Received: 7 Mar, 2013)2 Leeside Drive, PembrokeProposed Excavation Works and Construct New Wooden Deck near Pool Area.ApprovedPlanner: George ShakirConditions:- Planning Permission - Building Permit - GeneralP0187/13 THE TRUSTEES OF SALTUS GRAMMER (Received: 7 Jun, 2013) (Revised: 3 July 2013)SCHOOL108 St. John’s Road, PembrokeProposed New Security Hut and Refurbishment to St. John’s Road Gate of Saltus, Replacement of Existing Perimeter Fencing with New 8’-0’’ High Fencing and New Backup Generator.ApprovedPlanner: Tamsyn DoranConditions:- Planning Permission - Building Permit - General - Controlled Plant - Other - Excavated Material - Removal Landscaping - Protection of Existing vegetation - OtherP0190/13 BOARD OF THE BERMUDA HIGH SCHOOL (Received: 11 Jun, 2013)FOR GIRLS19 Richmond Road, PembrokeA fourth storey addition including a new fire egress stair and extension to existing fourth storey classroom.ApprovedPlanner: Tamsyn DoranConditions:- Planning Permission - Building Permit - GeneralCity of HamiltonP0150/13 ROYAL BERMUDA YACHT CLUB (Received: 14 May, 2013)15 Point Pleasant Road, City of HamiltonProposed Floating Dock for OPT1 Fleet Training RIB Boats.ApprovedPlanner: George ShakirConditions:- Planning Permission - Building Permit - General Docks - floating only - RegistrationSmiths(Revised: 25 April 2013, 4July 2013)P0059/13 LITTLEJOHN, Mr. Fred (Received: 4 Mar, 2013)40 North Shore Road, SmithsProposed Installation of a 7.52 KW Sun Power Solar Panel System (842 sq ft) - Listed Building Site.ApprovedPlanner: Larry WilliamsConditions:- Planning Permission - Building Permit - General Landscaping Protection of Conservation AreaAdvice Note: 1. The Board wishes to advise that the Building Permit application must be accompanied by specifications confirming that the hereby approved ground mounted solar panels can be installed in a manner which enables it to withstand hurricane force winds.2. For the avoidance of doubt, the applicant is advised that any construction information shown on the approved plans does not imply approval under the Building Code. Condition 2 refers.HamiltonP0116/13 ESTATE OF C.W. GIBBONS (Received: 18 Apr, 2013) (Revised: 5 July 2013)52 My Lord’s Bay Road, HamiltonProposed Renovations and Additions to Create 3rd Dwelling Unit.ApprovedPlanner: Victoria CaroloConditions:- Planning Permission - Building Permit - General - Garbage storage Outdoor Space - Private Amenity -2008 Plan - ParkingSt. George’sS0015/13 BERMUDA LAND DEVELOPMENT (Received: 13 May, 2013)COMPANY LTD.4 Orange Hole Road, St. George’s2 Stanley’s Run, St. George’sProposed Additional 2 Lots - (Total 3 Lots) and Grant of Two Right of Ways (each 12 ft wide)ApprovedPlanner: Victoria CaroloConditions: Planning Permission - Final Sub Division.Town of St. GeorgeP0186/13 TROTT, Mr. H. Courtney (Received: 7 Jun, 2013)17 Penno’s Wharf, Town of St. GeorgeProposed Installation of Wireless Antenna on Pennos Cruise Ship Terminal.ApprovedPlanner: Richard LowryConditions:- Building Permit - GeneralAdvice Note: The Board wishes to advise that the applicant must adhere to the regulations and recommendations established by the Regulatory Authority of Bermuda, including but limited to the requirement for installing hazard signage and ensuring compliance with guidelines for human exposure to radio frequency electromagnetic fields.